Sheet Medal & Flexible Design
Manufacturing Center of China Electronic Technology group
Corporations is a professional design institute owned by China
Electronic Technology group Corporations (CETC). Present Sheet
Medal Design CAD Center and Flexible Manufacturing Center
specialize in design and manufacturing of such sheet medal
components as computer case, antenna and etc. With the development
of sheet medal flexible design manufacturing center, current
design management environment can no longer meet the new demands,
which leads to urgent needs for information-based methods
to make standard and improve design management. Therefore,
enterprise IP will be better protected, production efficiency
will be improved and enterprise market competitiveness will
be strengthened.
Analysis
Having done research for current design environment in Sheet
Medal Flexible Design Manufacturing Center of CETC, we have
found the following problems existed in current design data
management:
1) Design data lies on manual management, and management is
lack of standard with low efficiency.
2) Design environment is lack of security protection, which
causes easy data loss and damage.
3) Design process data is controlled by design staff, which
leads to ineffective control and grasp of data by the whole
enterprise.
In order to help Sheet Medal Flexible Design Manufacturing
Center of CETC reach a higher level of design management,
shorten product R&D cycle and improves market competitiveness,
Top Era Technology Limited provides a solution aimed at the
above problems - "DCM Sheet Medal Design Data Version Management
System".
Sheet Medal Design Data Version
Management Solution
Sheet Medal Design Data Version Management System is achieved
through customization for Top Era Technology's DOIT system.
The solution includes Data Management and Security Management,
two major functions.
Based on centralized management of data, Sheet Medal Design
Data Version Management System provides design staff with
complete-process data version management functionality. Meanwhile,
the system builds an open and secure development design environment
for enterprises through complete security measures. Therefore,
enterprise design development cycle will be reduced and product
design efficiency is improved.
Sheet Medal Design Data Version Management System adopts B/S
three-layer mode. The effective separation of application
processing by three-layer mode fits more the execution of
key jobs as well as new application system that requires re-planning,
expanding and re-group. The three-layer mode composed of browser-based
standard client configuration and network server eases the
installation for the end-user.
Implementation
System implementation adopts scientifically standard ADT method.
Based on the principles of system research implementation
method and in accordance with internationally recognized advanced
methods, ADT, AcceleratorDOIT, is an accurate implementation
method system developed by Top Era Technology. ADT emphasizes
on re-useable flow-like production and is able to perform
continuous optimization. ADT divides complete implementation
process into 6 accurate procedures, meanwhile fully considering
key factors that will affect implementation during the whole
process.
ADT Implementation
ADI has 6 phases including plan, preparation, project blueprint
design, project blueprint implementation, preparation for
running, running and support. Among which, project blueprint
design and project blueprint implementation are both repeated
processes until clients' request are met.
ADT Implementation
• Plan
• During this phase, Sheet
Medal Design Center will know the basic infrastructure and
main functionalities of information system. This will enable
users to better understand the benefits brought by implementing
information system. All participants should grasp current
enterprise architecture and operational status, as well as
what will bring to the enterprise when implementing information
system. After this procedure, leader will acknowledge and
approve the project and client's confidence will be strengthened.
• Preparation
• Before the implementation
of information system, it is a must to understand current
enterprise product design overview and to define hidden problems.
During this phase, the main task is to build design management
model of Sheet Medal Design Center in order to provide a comparison
after implementation of information system and to clearly
define project scale. Meanwhile, it is necessary to prepare
for various resources and technologies of "Design Data Management
System".
• Project Blueprint Design
• During this phase, it
is a must to define basic scale of design data management
system in Sheet Medal Design Center, to confirm detailed project
implementation plan, to put project goal in details and finally
to confirm business request and description, analysis and
optimization of workflow.
• Project Blueprint Implementation
• During this phase, project
team must control development process to gradually execute
blueprint and finally complete system test, obtaining system
confirmation from Sheet Medal Design Center.
• Preparation for Running
• Lots of test running
for end-users to complete preparation for system delivery,
ensuring system running properly and solving redundancy problem.
• Running and Support
• Making correct system
delivery to ensure proper running
ADT's 6 phases are inter-connected with clear goal of each
phase, in order to monitor complete process together with
Sheet Medal Design Manufacturing Center and ensure system's
effective running. ADT also guarantees system development
is in accordance with clients' actual requests through client's
partly participation in each phase. Broad information-based
teaching and training assists system to be delivered properly
with high working efficiency.
Conclusion
After implementing "Sheet Medal Design Data Version Management
System", Sheet Medal & Flexible Design Manufacturing Center
of China Electronic Technology group Corporations achieves
the followings:
1) Secure and reliable design environment in enterprise intranet,
eliminating access violation and preventing data conflict.
2) Centralized management for various types of design data,
enabling design data share and preventing design data loss
caused by manual operations.
3) Project-team-level collaborative design support is achieved
via branching and merging.
4) Version (process) management of Design data enables tracking
and tracing of design process data.
5) Design achievement management increases design reuse, enabling
knowledge management and accumulation.
|